the rock push

Dig up new better leg at the bottom of snake bend, and dump one of the obstucting rocks into an existing hole so to make a smoother error free ride.

The reroutes

the few words in the busy trail work. we’ve 1. Straighten the bad flow lines before snake bend, 2. marking and prep the slopes after Motherbridge. 3. new leg to remove the bad turn at bottom of the Snake bend

Krankin’ at Kent Ridge

The next MTB race in Singapore will be at Kent Ridge again. mark 18 March 2007  down as the date with us more details can be obtained from DirTraction website.

Ride the Trail : Kent Ridge

After months of waiting, Kent Ridge Mountain bike trail is ‘unofficially’ open for riding. DO take care riding the trail for now, we haven’t had the time to walk through after the big rainy season to check for dangers. The Northshore freeride playground is ready. We are actively looking for more material to complete and ...

Trail is open!

After months of waiting, Kent Ridge Mountain bike trail is ‘unofficially’ open for riding. DO take care riding the trail for now, we haven’t had the time to walk through after the big rainy season to check for dangers. We do not suggest riding the Northshore playground for now, as we do have some unnailed ...

Tampines MTB Trail survived

The new Tampines MTB extension survived the a full day of racing. SACA XC DirtzBash turn out to be as muddy as needed, giving everyone a whole load of fun. The trail will be up for surfacing and modifications, stay tune for a dryer ride.

Kent Ridge Trail

We’ve gotten news that Kent Ridge is soon to be ready. We are talking about in a week or so. Meanwhile, some updates on the North Shore rides available @ http://kentridge.eaglet.org

faraway so close

We are almost done with the North shore section. is rainy and wet, equipment rusting, nailing and finishing getting worse. Alvin Jeff and me take our work on existing fallen log. Seriously inexperience on log work we are. can’t seems to secure the pieces together to get a stiff structure with those big logs. After ...

the banked roller

With the first ramp built leading to nowhere since day one, we decided to give this best line the fastest and most technical bridge we ever built. A banked roller that twist and bank 3 times in a space of 4metres. Liyana and Alvin got things started with the nailing while I do most of ...

layout and planking the floor

with the wooden berm stopping at a box T-junction, Jeff started the connecting 1.5metres long floor section, so to finish the loop for the roller coaster straight and the beginner loop. The fast roller section is also layout. We can start building this technical banked roller, the most technical till date tomorrow. I always wanted ...