the arena day 3

raising the causeway

raising the causeway

 

bridging the last drop and spectator walking zone

bridging the last drop and spectator walking zone

 

trail to be build .. the climb in front of the grand stand

trail to be build .. the climb in front of the grand stand

 

cutting the chicken line

cutting the chicken line

 

covering up the expose old trails

covering up the expose old trails

 

work highway, the path where dumper roams

work highway, the path where dumper roams

 

cleared, all ready for the rock placement and lines

cleared, all ready for the rock placement and lines

 

201004031876-TBP-Trail-Rebuild-Wonderland

 

201004031874-TBP-Trail-Rebuild-Angry