the February sun really flaunt its ray the whole afternoon.
We took the trail out of the valley towards Ziggurat and build a V-section switchback upwards, taking the opportunity to train the bunch of construction crew on build techniques.
The short 30metres section should take a total of a day with the help of excavator.
meanwhile at the BMX area, the area is flatten and graded for drainage.