we attempted unsupervised trail building the past 2 days, in hope certain simpler task can be done without close supervision.
the end results is about 85% satisfactory and we are glad the example made earlier can be pretty much replicated.
The old horizon hill is a water gulley, washing pebbles and sand when it rains, and is now cut 1/2 ft deep at certain section rendering some serious problem going towards YOG.
A thin slice of pave is what we needed and in hope this should counter the granite chip riding surface in which seriously drag the rider down.
this is what we found 2 days after.