With straight way 2 pre-dumped, we’ve Tom on the cat and another excavator helping with the jumps shaping at straight way 2
The filler crew of 6 men still at the massive first table top when Tom started straight way 4 and later straight way 3.
the small rollers at striaght way 3 was fast, fast dump and fast shaped.
Got alot more comfortable on the bobcat today, and I started to transport top soil to the jumps for the fillers.
it got technical when we started to fill straight way 2, in which the bobcat endo and flipped back at the massive jumps.
this bobcat is pretty useful for the drain cutting, in which we coordinate with one of the more experience mini-excavator guy to have the team manager platform deck out with
soil cut from the drainage.
At sun down, the track took shape,
Tom leveled out straight way 1, which me and Jason awaited patiencely at the start hill with our bikes, ready to pounce on the nicely leveled