The canvas coverall are in!
The crew took the afternoon to cover the BMX track, just in time for one heavy load of rain to pour when the last peg is planted.
One lucky move we’ve there.
We let the rain pour the track before venturing deep into the BMX track for some drainage inspection.
water are flowing exactly where we wanted and is great to see pipes and earth drains are moving the loads of water off from the jumps.