Krankin’ at Kent Ridge
The next MTB race in Singapore will be at Kent Ridge again. mark 18 March 2007Â down as the date with us more details can… Read More »Krankin’ at Kent Ridge
The next MTB race in Singapore will be at Kent Ridge again. mark 18 March 2007Â down as the date with us more details can… Read More »Krankin’ at Kent Ridge
After months of waiting, Kent Ridge Mountain bike trail is ‘unofficially’ open for riding. DO take care riding the trail for now, we haven’t had… Read More »Ride the Trail : Kent Ridge
After months of waiting, Kent Ridge Mountain bike trail is ‘unofficially’ open for riding. DO take care riding the trail for now, we haven’t had… Read More »Trail is open!
We’ve gotten news that Kent Ridge is soon to be ready. We are talking about in a week or so. Meanwhile, some updates on the… Read More »Kent Ridge Trail
The new Tampines MTB extension survived the a full day of racing. SACA XC DirtzBash turn out to be as muddy as needed, giving everyone… Read More »Tampines MTB Trail survived
We are almost done with the North shore section. is rainy and wet, equipment rusting, nailing and finishing getting worse. Alvin Jeff and me take… Read More »faraway so close
With the first ramp built leading to nowhere since day one, we decided to give this best line the fastest and most technical bridge we… Read More »the banked roller
with the wooden berm stopping at a box T-junction, Jeff started the connecting 1.5metres long floor section, so to finish the loop for the roller… Read More »layout and planking the floor
another start early end late day. With the beginner ‘low’ North Shore section lay out by Jeff a day earlier, Me and Alvin took 5mins… Read More »the beginner section
With much of the wooden structure hand build with saw and hammer. We took a jigsaw and power drill to see what we can build… Read More »here comes the power tools