Skip to content
Home » News » Trail work » Ketam MTB Park » Gravedrop

Gravedrop

The biggest and last rock section to be build and it simply got to be hand build (ouch!)

As the name suggest, the lines will not be easy and will be curvy and lack the flow of the previous stuff we build over the 2 weeks.

We started building the drop from the bottom midsection.

Doing as much small rock work as much as we can at ‘Ling’s step’, a rock garden mid section. while I concentrate the work with 55 and Kee to get bigger drop off rocks into place at the bottom.

The effort took the afternoon with Ling, William, Joey and me placing whatever we can before the day close.

A tiring mosquito infested day.

We will try again tomorrow.