Skip to content
Home » News » Trail work » Kent Ridge MTB Trail » here comes the power tools

here comes the power tools

With much of the wooden structure hand build with saw and hammer.

We took a jigsaw and power drill to see what we can build out of it.

Nik and I meet for the afternoon.

Our task today involved doing up a small 2metres long section, connecting a new entry ramp to the straight roller line.

We spend the first 30mins figuring how to get things done, jigsaw, generator, powerdrill, the correct drill bit needed etc etc. In no time we are carving the planks to custom fit shape so to fit the wierd triangle section needed.

 

BEFORE                                           AFTER

powering away.

Jeff pop by in the late afternoon, and we tie down some stuff on what to build and when.

Is definitely getting interesting…

2 metres link bridge – 6 man hours